Pilkington Automotive | Crawley

Modernization of Pilkington Automotive

Client: Pilkington Automotive

Location: Manor Royal, Crawley

Objective: To modernize the facility with enhanced amenities, improved workspace, and upgraded infrastructure.

Background

Pilkington Automotive, a key player in the automotive glass industry, recognized the urgent need to modernize their Manor Royal location to improve operational efficiency, employee satisfaction, and the overall aesthetic appeal of the facility. The existing infrastructure, including flooring, toilets, office spaces, and storage solutions, was outdated and no longer met the company’s evolving needs.

Challenges

  1. Aged Infrastructure: The facility was equipped with old windows, doors, and flooring that were not only aesthetically unappealing but also inefficient.
  2. Lack of Modern Amenities: The absence of a dedicated canteen area and inadequate storage solutions hindered the staff’s convenience and the organization’s functionality.
  3. Limited Space for Managerial Functions: The existing office space did not adequately support managerial tasks and privacy.
  4. Operational Disruption Risk: Implementing such extensive renovations risked disrupting the site’s daily operations.

Solutions

  1. Infrastructure Overhaul: We replaced the old windows and front door with new, energy-efficient models to enhance both the facility’s appearance and its environmental footprint.
  2. Flooring Replacement: The entire facility’s flooring was upgraded to modern, durable materials that could withstand heavy industrial use while offering a refreshed look.
  3. Enhanced Amenities: To boost employee satisfaction and productivity, we constructed a new tea point and canteen area, allowing staff to enjoy their breaks in a comfortable and appealing environment.
  4. Manager’s Office and Storage Solutions: A new office was built for the manager, designed to support both day-to-day operations and privacy needs. Additionally, two bespoke heavy-duty cupboards were constructed to securely store printers and important documents.
  5. Innovative Construction Techniques: To minimize operational disruption, we employed state-of-the-art construction techniques and scheduled works during off-peak hours.

Outcomes

  • Improved Employee Morale: The new amenities significantly improved the staff’s overall satisfaction and morale.
  • Increased Operational Efficiency: The modernization of the facility’s infrastructure and the addition of specialized storage solutions streamlined operations.
  • Enhanced Aesthetic Appeal: The facility’s updated look fostered a positive image among clients and visitors.
  • Sustainable Practices: The introduction of energy-efficient windows and doors contributed to the company’s sustainability goals.

Conclusion

The comprehensive modernization project at Pilkington Automotive’s Manor Royal location not only revitalized the facility’s infrastructure, but also significantly enhanced employee satisfaction and operational efficiency. Through careful planning and execution, the project was completed with minimal disruption to daily operations, demonstrating our commitment to delivering high-quality solutions that meet our clients’ needs and exceed their expectations.

Related Posts

adminjlh1431

Pilkington Automotive | Crawley

Modernization of Pilkington Automotive Client: Pilkington Automotive Location: Manor Royal, Crawley Objective: To modernize the facility with enhanced amenities, improved

Read More »